Go to CS2103/T main site
  • Dashboards home
  • Participation dashboard
  • Forum dashboard
  • iP progress
  • iP comments
  • iP Code
  • tP progress
  • tP comments
  • tP Code
  • tP progress dashboard

    • Details about tP grading are here.
    • Note that the progress shown here is just a rough guidance as it was generated by an automated script. A human inspection will be done after the final submission to confirm the script's findings.
    • Meaning of colors/icons:
      • : you can click on this icon to find more info
      • ABC : you have done the corresponding item.
      • ABC : you have done the corresponding item which is an optional item (well done!).
      • ABC : item overdue, you have not done the corresponding item yet.
      • ABC : item due soon, not done yet.
      • ABC : optional item due soon, not done yet.
      • The [?] suffix (e.g., ABC [?]) indicates there are no data for that item yet. It will be updated in a later time when the relevant data are available.
    • If you have queries about the data shown in this page, please email cs2103@comp.nus.edu.sg.

    [This page was last updated on Nov 11 2020]

    Team IDTeam The current CI status as generated by GitHub actionsCI Status i.e., tP tasks to be done by the whole teamTasks
    CS2103T-W10-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W10-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W10-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W10-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W11-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W11-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W11-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W11-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W12-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W12-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W12-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W12-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W13-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W13-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W13-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W13-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-W14-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-W14-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-W14-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-W14-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W15-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W15-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W15-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W15-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W16-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W16-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W16-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W16-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W17-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W17-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W17-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-W17-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T09-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T09-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T09-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T09-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T10-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T10-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T10-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T10-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T11-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T11-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T11-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T11-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T12-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T12-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T12-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T12-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T13-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T13-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T13-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T13-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-T14-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-T14-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-T14-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-T14-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T15-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T15-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T15-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T15-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-T16-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-T16-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-T16-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-T16-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T17-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T17-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T17-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-T17-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-F09-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-F09-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-F09-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-F09-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-F10-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-F10-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-F10-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103-F10-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F11-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F11-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F11-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F11-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F12-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F12-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F12-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F12-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F13-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F13-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F13-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released
    CS2103T-F13-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 releasedv1.3 demov1.4 set upUi.pngv1.4 wrap upv1.4 released

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W10-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W10-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W10-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W10-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W11-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W11-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too No
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W11-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W11-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W12-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W12-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W12-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W12-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W13-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W13-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W13-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W13-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document No
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-W14-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-W14-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-W14-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-W14-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W15-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W15-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W15-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W15-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W16-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W16-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W16-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W16-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W17-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W17-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W17-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W17-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T09-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T09-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T09-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T09-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T10-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T10-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T10-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T10-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T11-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T11-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T11-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T11-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T12-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T12-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T12-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T12-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T13-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T13-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T13-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T13-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T14-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T14-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T14-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T14-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T15-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T15-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T15-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T15-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T16-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T16-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T16-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too No
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T16-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T17-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T17-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T17-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T17-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F09-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F09-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F09-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F09-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F10-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F10-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F10-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F10-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F11-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F11-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F11-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F11-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F12-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F12-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F12-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F12-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F13-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F13-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F13-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F13-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in week 10 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in week 11 Yes
    v1.3 demo 11 Added screenshots of v1.3 to the project notes document Yes
    v1.4 set up 12 milestone v1.4 is present and has a deadline Yes
    Ui.png 13 docs/images/Ui.png available and updated recently Yes
    v1.4 wrap up 13 milestone v1.4 is closed, and all its issues are closed too Yes
    v1.4 released 13 Released v1.4 jar file on GitHub in week 13 Yes
    Student number (partial)Student i.e., weeks in which some code was committed to the repoWeekly progress i.e., other tP-related individual tasksIndividual tasks
    A0117428_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0150036_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0150061_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0159922_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0166931_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0167650_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0167817_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0168050_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0168635_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0170547_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0177871_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0177873_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0180014_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0180324_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0183080_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0183548_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0183569_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0184524_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0184537_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0185084_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0187381_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0188036_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0188189_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0189525_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0189606_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0190134_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0190241_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194088_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194496_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0194526_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194532_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194541_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194562_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0194563_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194566_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196511_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196574_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196612_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0196660_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0197077_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0197079_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0197135_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0199347_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199366_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199369_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199464_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0199741_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199809_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199832_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200162_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200177_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0200393_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200559_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200603_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200700_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0200760_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200765_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0200794_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200813_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200835_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0200908_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0201181_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0201191_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201327_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201764_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201775_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0201835_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201915_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201975_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0202092_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0202284_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0202348_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0204208_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204705_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204750_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0204752_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204754_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204950_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205204_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205232_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205369_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205371_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205424_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205497_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205504_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205575_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0205601_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205607_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205742_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205794_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206131_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0206170_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206353_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206358_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0206368_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0208035_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0135448_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0135451_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0146240_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0149796_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0149802_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0149836_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0149859_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0149884_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0149947_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0149980_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0149989_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0150008_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0150022_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0150025_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0150034_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0150038_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0150048_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0150099_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0161202_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0164623_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0169843_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0177473_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0178059_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0180058_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0180061_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0180092_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0182726_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0183151_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0183534_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0184014_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0184257_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0184411_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0184678_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0187434_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0187737_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0187858_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0189168_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194484_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194487_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0194488_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194489_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194512_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194516_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194567_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194568_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0194569_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196491_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196510_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196539_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196545_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196583_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196589_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196600_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196608_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196616_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196626_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196633_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196634_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196650_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196680_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196683_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196686_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0196705_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0197082_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0197215_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0197283_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0197297_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0197310_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0197731_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0197768_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0199107_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199122_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199123_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199141_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199156_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199164_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199177_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199179_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199220_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199248_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199262_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0199317_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199340_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199359_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199377_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199395_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199397_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199399_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199420_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199424_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0199443_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199451_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199476_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0199477_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199502_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199508_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199522_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199537_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0199554_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199556_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199568_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199574_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199579_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199596_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199624_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199627_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199633_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199648_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199730_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199753_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199758_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199760_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199761_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199769_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199770_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199776_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199786_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199799_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199811_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199815_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199885_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199890_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0199902_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199922_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199926_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199971_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199974_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0199994_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200001_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200007_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200025_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200044_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200054_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200076_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200112_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200116_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200117_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200119_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200134_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200152_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200161_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200175_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200190_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200204_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200223_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0200498_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200534_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200541_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200593_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200618_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200643_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200657_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200668_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200670_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200673_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200676_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200678_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200679_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200682_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200687_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200691_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200698_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200718_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200732_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200739_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200750_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200751_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200761_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200766_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0200777_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200778_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200783_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200788_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0200801_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201182_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0201185_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201189_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201229_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0201233_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0201293_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0201367_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201406_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201417_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201446_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201480_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0201495_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201575_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201614_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201640_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201706_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201715_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201725_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201733_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201747_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201768_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201829_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201836_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201838_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201841_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201847_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201866_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201889_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201920_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201924_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201926_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201958_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0201976_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0202017_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0202062_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0202132_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0202170_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0202181_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0202395_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0202720_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0202788_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0202811_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204671_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204679_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204683_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204700_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204707_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204713_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0204718_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204722_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204736_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204740_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204771_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204777_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204786_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204812_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204817_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204827_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204838_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204839_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204848_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0204851_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204867_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0204878_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204879_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0204884_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204885_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204888_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204927_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204973_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0204978_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205011_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205049_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205056_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205068_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0205103_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0205111_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205116_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205128_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205129_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0205141_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205150_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205172_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205196_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205216_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205235_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0205253_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205260_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0205280_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205295_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205302_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205306_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205314_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205315_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0205333_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205344_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205471_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205496_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205502_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0205519_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0205520_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205565_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0205578_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0205615_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205668_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205671_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205672_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205678_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205680_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205682_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205721_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205748_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205773_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205792_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205812_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0205825_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0205876_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205877_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205878_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205879_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0205882_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205883_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205928_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205934_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0205983_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206006_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206010_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206020_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206022_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206031_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206050_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206095_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206096_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206124_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206151_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206153_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206160_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206191_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206249_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206311_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206330_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206332_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206345_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206350_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206377_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206380_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206403_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206418_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206420_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0206443_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0207959_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0207963_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0207967_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0207999_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0208003_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0208026_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 IssuesUG DraftPPP Draftv1.4 IssuesPPP
    A0208036_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0210908_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0211301_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0211307_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 IssuesPPP
    A0211553_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0211628_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0211714_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP
    A0211899_ 78910111213 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draftv1.3 Issuesv1.3 PRsUG DraftPPP Draftv1.4 Issuesv1.4 PRsPPP

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 26 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 20 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 56 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 92 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 20 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 12 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 35 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 40 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 120 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 71 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 19 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 35 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 37 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 10) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 19 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 38 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 24 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 51 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 46 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 57 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 38 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 16 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 15 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 126 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 37 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 16 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 37 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 16 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 8 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 47 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 28 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 46 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 69 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 29 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 101 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 7 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 68 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 20 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 14 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 32 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 27 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 36 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 37 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 13 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 19 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 43 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 60 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 15 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 4 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 22 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 66 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 50 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 3 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 39 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 4 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted No

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 40 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 50 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 29 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 26 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 12 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 28 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 24 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 15 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 30 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 36 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 32 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 76 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 62 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 50 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 35 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 40 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 314 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 28 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 25 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 27 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 87 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 26 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 74 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 38 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 10 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 30 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 27 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 21 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 31 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 9 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 14 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 55 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Did not contribute any commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 18 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 5 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 23 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 32 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 3 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 27 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 7 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 41 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 36 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 36 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 37 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 9) Yes
    Logging 10 Used logging in the code (found: 41) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 49 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 66 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 27 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 31 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 50 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 12 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 75 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 61 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 35 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 38 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 39 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 98 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 9 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 51 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 44 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 96 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 41 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 74 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 14 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 34 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 31 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 25 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 92 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 28 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 4 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 46 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 22 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 12 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 36 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 0 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 1 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 11 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 4 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 11 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted No

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 9 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 3 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 28 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 17 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 22 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 48 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 106 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 20) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 150 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 132 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 43 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 32 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 24 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 22 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 145 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 13 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 170 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 35 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 25 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 17 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 33 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 28 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 79 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 116 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 41 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 2 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 16 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 10 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 43 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 8 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 30 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 21 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 44 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 66 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 26 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 67 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 41 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 24 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 33 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 103 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 82 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 25 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 39 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 76 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 57 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 49 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 16 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 39) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 75 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 68 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 15 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 48 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 28 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 10 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 19 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 11 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 12) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 126 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 51 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 12 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 28 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 21 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 34 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 40 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 12 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 18 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 56 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 53 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 11 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 94 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 31 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 9 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 3 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 19 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 22) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 16 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 49 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 25 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 35 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 60 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 61 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 14 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 28 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 56 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 284 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 102 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 28 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 19 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 39 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 30 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 42 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 26 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 49 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 83 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 10 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 33 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 47 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 52 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 11 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 20 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 17 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 3 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 22 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 22 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 7 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 30 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 33 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 29 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 24 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 19 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 119 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 62 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 9 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 36 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 19 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 75 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 11 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 35 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 12 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 2 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 27 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 7 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 18 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 31 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 28 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 19 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 37 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 12) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 1 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 59 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 3 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 14 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 76 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 31 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 19 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 23 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 8 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 1 commit to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 14 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 3 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 0 issues) No
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 44 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 14 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 24 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 13 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 23 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 36 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 15 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 4 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 42 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 31 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 88 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 65 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 12 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 183 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 44 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 56 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 52 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 65 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 49 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 75 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 52 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 57 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 20 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 16 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 20 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 22 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 77 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 0 issues) No
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 16 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 13 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 182 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 17 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 24 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 48 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 28 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 73 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 28 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 10 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 22 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 38 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 27 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 28 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 64 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 9 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 21 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 57 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 12 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 10 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 16 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 38 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 14 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 17 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 12 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 20 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 37 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 21 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 21 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 12) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 6 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 29 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 56 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 44 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 22 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 104 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 76 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 100 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 28 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 42 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 27 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 28 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 49 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 87 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 24 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 18) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 445 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 24 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 30 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 14 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 6 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 21 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 74 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 28 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 19 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 25 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 23 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 39 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 37 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 36 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 29 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 58 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 11 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 26 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 54 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 71 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 15 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 15 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 16 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 20 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 25 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 36 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 24 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 38 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 53 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 36 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 29 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 17 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 9) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 251 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 45 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 16 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 121 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 31 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 26 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 137 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 36 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 32 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 37 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 165 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 40 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 10 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 24 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 25 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 28 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 10 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 55 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 22 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 47 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 28 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 32 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 69 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 79 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 14 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 48 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 37 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 12 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 32) Yes
    Logging 10 Used logging in the code (found: 47) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 107 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 64 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 35 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 145 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 19 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 41 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 47 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 25 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 36 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 40 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 15) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 219 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 54 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 3 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 15 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 49 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 26 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 16 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted No

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 10 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 26 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 0 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted No

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 20 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 24 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 14) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 42 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted No

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 16 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 20 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 23 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 45 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 9 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 28 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 85 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 2 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 35 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 19 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 29 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 22 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 30 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 9) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 104 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 37 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 15 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 19 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 21 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 167 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 18 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 38 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 21) Yes
    Logging 10 Used logging in the code (found: 27) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 16 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 58 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 55 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 5 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 19 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 26 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 21 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 45 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 15 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 22 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 22 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 32 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 44 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 13 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 5 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 9 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 154 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 66 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 16 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 10 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 11 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 59 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 54 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 18 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 6 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 42 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 66 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 72 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 20 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 71 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 47 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 61 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 60 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 58 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 20 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 9 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 294 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 22 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 33 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 77 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 47 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 37 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 24 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 40 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 16) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 323 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 89 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 73 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account No
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 13 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 16 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 18 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 205 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 12 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 65 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 108 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 83 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 26 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 22 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 10 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 20 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 92 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 22 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 22 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 20 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 44 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 16 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 61 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 32 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 68 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 41 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 52 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 54 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 196 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 63 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 16 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 6 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 24 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 33 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 58 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 21 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 43 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 23 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 58 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 0 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 19 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 38 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 32 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 23 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 74 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 15 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 126 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 76 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 19 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 36 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 59 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 80 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 50 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 12 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 9) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 27 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 14 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 139 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 67 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 38 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 78 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 13 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 21 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 45 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 42 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 38 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 20 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 35 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 46 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 53 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 214 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 25 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 33 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 49 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 142 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 51 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 147 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 20 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 27 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 22 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 39 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 40 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 26 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 76 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 129 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 67 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 34 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 18 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 12 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 47 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 50 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 1 commit to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 35 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 64 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 26 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 48 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 21 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 47 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 22 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 62 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 18 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 28 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 34 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 45 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 75 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 51 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 44 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 37 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 27 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 49 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 110 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 21 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 181 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 91 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 9 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 29 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 14) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 0 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 49 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 59 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 102 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 15 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 204 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 24 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 18 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 22 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 33 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 56 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 33 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 44 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 237 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 59 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 21 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 19 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 376 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 68 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 38 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 24 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 13 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 5 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 12 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 23 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 25 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 45 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 33 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 17) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 19 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 67 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 70 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 37 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 36 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 68 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 73 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 12) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 23 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 220 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 83 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 36 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 21 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 33 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 42 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 51 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 50 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 152 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 15 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 235 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 69 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 16 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 6 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 23 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 10 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 52 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 20 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 32 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 54 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 40 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 5 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 52 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 41 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 39 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 54 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 43 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 38 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 38 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 38 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 35 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 299 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 73 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 32 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 21 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 34 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 33 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Did not contribute any commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 19 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 19 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 0 issues) No
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 31 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 26 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 10 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 9 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 47 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 23 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 12 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 21 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 42 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 18 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 52 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 37 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 28 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 23 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 11) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 31 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 44 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 38 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 40 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 17 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 122 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 36 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 61 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 84 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 81 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 66 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 76 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 72 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 78 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 16 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 37 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 25 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 50 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 21 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 51 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 84 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 16 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 7 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 31 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 52 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 28 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 33 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 66 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 254 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 64 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 32 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 56 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 37 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 44 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 36 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 17 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 7 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 405 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 21 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 35 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 38 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 12 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 36 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 15 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 10) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 166 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 66 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 24 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 35 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 84 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 84 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 92 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 83 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 50 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 61 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 7 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 11) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 629 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 74 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 29 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 41 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 52 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 22 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 77 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 36 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 18 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 30 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 43 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 175 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 59 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 47 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 56 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 61 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 26 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 23 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 12 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 97 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Did not contribute any commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 37 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 2 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 15 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 26 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 114 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 30 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 68 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 19 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 34 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 20 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 106 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 37 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 23 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 56 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 30 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 125 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 16 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 27 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 1 commit to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 33 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 108 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 31 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 19 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 90 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 35 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 22 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 34 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 71 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 38 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 90 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 68 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 121 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 122 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 11 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 9 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 24) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 13 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 149 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 72 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 69 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 38 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 34 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 31 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 23 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 53 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 17 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 20 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 225 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 78 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 26 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 23 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 24 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 17 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 51 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 14 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 81 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 106 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 29 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 19 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 49 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 30 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 27 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 79 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 52 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 18 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 23 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 8 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 96 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 32 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 43 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 86 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 129 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 12 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 35 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 36 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 40 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 28 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 67 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 31 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 14 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 105 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 75 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 31 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 17 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 44 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 29 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 45 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 104 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 154 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 30 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    UG Draft 11 Added some content to the UG in week 11 (found: 86 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 35 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 59 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 44 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 57 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 22 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 55 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 119 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 30 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 28 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 60 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 23 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 89 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 165 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 55 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 38 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 30 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 11 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 70 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 28 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 47 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 38 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 30 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 35 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 109 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 56 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 24 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 21 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 27 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 20 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 18 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 40 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 38 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 31 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 33 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 20 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 76 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 25 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 64 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 38 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 29 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 36 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 289 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 103 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 10 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 41 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 25 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 76 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 82 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 30 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 22 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 42 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 81 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 76 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 27 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 55 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 6 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 39 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 33 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 38 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 52 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 29 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 13 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 22 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 36 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 28 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 85 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 26 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 109 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 55 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 11 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 45 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 39 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 56 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 28 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 98 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 19 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 25) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 19 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 316 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 23 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 16 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 27 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 42 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 60 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 142 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 47 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 37 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 14) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 18 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 4 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 14 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 38 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 45 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 175 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 51 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 36 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 14 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 61 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 15 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 115 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 106 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 32 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 28 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 42 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 39 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 35 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 53 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 23 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 10 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 26 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 353 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 12 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 33 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 19 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 54 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 61 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 93 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 37 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 85 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 15 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 22 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 193 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 91 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 13 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 12 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 77 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 25 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 24 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 46 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 131 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 101 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 14 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 49 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 60 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 41 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 36 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 30 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 22 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 75 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 37 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 23 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 5 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 38 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 46 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 42 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 24 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 116 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 31 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 36 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 18 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 10 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 152 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    UG Draft 11 Added some content to the UG in week 11 (found: 42 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 18 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 34 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 31 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 30 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 55 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 87 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 33 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 36 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 54 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 34 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 68 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 41 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 45 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 21 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 15 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 23 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 53 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 69 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 41 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 22 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 22 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 49 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 101 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 19 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 26 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 5 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 39 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 117 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 51 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 39 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 9 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 80 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 17 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 114 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 117 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 20 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 42 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 16 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 61 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 14) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 155 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 51 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 27 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 58 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 64 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 52 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 73 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 8 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 69 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 31 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 30 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 16 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 38 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 44 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 43 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 15 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 52 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 100 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 97 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 41 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 41 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 7 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 35 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 11) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 80 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 33 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 6 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 17 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 14) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 101 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 19 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 14 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 62 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 46 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 60 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 2 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 36 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 23 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 64 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 20 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 56 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 11 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 39 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 48 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 41 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 126 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 16) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 18 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 12 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 150 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 31 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 19 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 46 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 45 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 74 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 101 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 147 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 98 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 101 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 18 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 10) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 24 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 139 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 67 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 34 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 10 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 6 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 27 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 19 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 85 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 72 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 37 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 64 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 21 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 20) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 623 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 62 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 15 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 60 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 53 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 29 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 83 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 27 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 15 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 106 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 39 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 38 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 24 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 23 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 39 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 60 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 342 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 47 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 32 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 25 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 31 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 43 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 12 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 17 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 16 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 21 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 14 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 16 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 16 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 15 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 167 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 49 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 25 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 28 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 59 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 35 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 41 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 36 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 16 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 11 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 46 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 22 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 55 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 65 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 51 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 24 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 13 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 27 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 460 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 32 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 46 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 70 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 23 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 81 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 91 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 13 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 38 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 52 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 8 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    UG Draft 11 Added some content to the UG in week 11 (found: 19 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 57 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 0 issues) No
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 100 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 42 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 96 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 235 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 44 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 37 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 60 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 12) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 0 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 81 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 30 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 53 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 49 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 98 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 15) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 12 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 30 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 52 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 16 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 41 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 67 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 63 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 98 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 17) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 70 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 25 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 14 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 1 commit to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 13 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 28 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 4 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 28 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 18 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 45 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 31 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 12 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 18) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 93 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 74 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 54 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 67 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 69 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 107 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 20) Yes
    Logging 10 Used logging in the code (found: 14) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 33 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 117 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 75 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 47 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 18 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Did not contribute any commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 21 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 53 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 46 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 35 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 55 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 82 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 81 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 13 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 25 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 25 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 132 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 50 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 27 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 20 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 25 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 39 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 41 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 25 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 71 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 264 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 63 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 20 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 14 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 35 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 24 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 33 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 33 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 11 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 16 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 43 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 69 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 59 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 25 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 59 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 77 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 28 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 16 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 71 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 42 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 24 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 27 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 20 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 31 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 102 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 51 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 27 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 58 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 53 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 86 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 11 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 19 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 33 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 74 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 62 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 20 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 438 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 54 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 30 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 44 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 22 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 92 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 14 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 25 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 117 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 57 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 28 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 18 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 5 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 59 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 114 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 39 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 11 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 63 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 43 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 13 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 47 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 26 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 29 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 49 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 11 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 12) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 13 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 363 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 165 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 21 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 43 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 7 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 17 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 49 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 49 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 131 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 38 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 47 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 30 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 16 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 21 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 22 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 10 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 73 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 62 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 82 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 11 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 4 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 18 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 66 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 20 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 10 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 10 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 119 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 53 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 37 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 10 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 8 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 115 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 10 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 43 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 11 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted No

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 36 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 38 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 44 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 1 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 55 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 34 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 38 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 46 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 35 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 61 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 91 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 36 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 18 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 19 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 19 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 34) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 89 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 84 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 22 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 37 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 47 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 24 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 52 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 28 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 17 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 14 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 48 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 67 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 34 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 20 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 33 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 52 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 85 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 34 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 86 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 16 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 56 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 77 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 16 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 31 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 78 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 18 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 16 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 34 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 20 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 12) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 228 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 83 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 17 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 45 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 91 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 12 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 14 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 6 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 10 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 80 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 56 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 13 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 25 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 77 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 26 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 73 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 18 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 68 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 15 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 18 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 57 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 47 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 42 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 164 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 49 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 40 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 102 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 22 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 186 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 62 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 40 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 12 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 4 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 73 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 339 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 34 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 39 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 80 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 112 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 76 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 14 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 87) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 42 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 15 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 477 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 95 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 48 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 15 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 9 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted No

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 12 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 2 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 46 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 30 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 28 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 40 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 56 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 13 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 80 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 47 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 12 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 45 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 52 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 70 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 114 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 122 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 13 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 25 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 16 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 18 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 30 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 39 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 147 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 100 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 40 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 122 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 26) Yes
    Logging 10 Used logging in the code (found: 12) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 63 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 31 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 261 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 47 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 41 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 15 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 9 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 38 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 29 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 43 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 1 commit to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 15 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 13 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 16 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 29 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 65 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 39 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 231 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 18 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 49 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 30 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 24 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 17 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 3 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 31 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 33 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 87 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 0 issues) No
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 40 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 27 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 10 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 87 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 75 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 32 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 32 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 33 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 36 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 31) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 18 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 69 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 29 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 1 commit to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 72 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 218 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 16 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 5 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 68 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 37 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 55 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 56 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 65 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 17 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 49 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 100 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 16 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 411 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 107 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 314 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 60 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 36 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 17 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 163 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 12 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 25 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 17 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 25 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 63 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 37 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 80 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 24 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 33 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 14) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 29 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 47 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 51 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 45 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 54 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 31 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 66 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 365 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 50 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 33 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 9 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 38 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 56 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 44 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 30 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 20 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 44 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 199 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 59 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 27 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 35 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 56 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 151 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 1 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 17 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 43 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 32 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 80 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 98 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 43 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 19 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 14 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 65 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 30 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 38 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 74 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 92 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 54 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 18 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 142 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 31 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 27 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 55 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 31 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 35 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 109 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 68 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 107 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 116 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 17 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 18 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 12 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 14) Yes
    Logging 10 Used logging in the code (found: 32) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 43 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 22 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 304 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 33 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 47 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 23 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 21 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 47 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 82 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 21 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 25 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 27 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 47 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 110 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 42 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 15 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 32 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 29 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 54 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 56 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 54 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 28 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 30 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 44 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 45 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 53 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 26 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 37 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 10 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 104 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 85 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 32 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 33 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 58 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 41 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 32 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 43 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 61 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 70 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 12) Yes
    Logging 10 Used logging in the code (found: 13) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 129 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 49 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 31 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 70 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 33 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 24 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 52 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 163 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 39 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 101 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 50 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 13 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 28 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 55 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 37 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 30 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 30 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 63 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 40 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 156 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 7 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 24 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 211 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 142 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 31 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 28 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 38 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 34 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 9 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 20 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 45 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 65 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 38 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 36 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 29 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 66 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 61 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 12 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 7 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 15 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 52 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 49 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 26 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 22 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 20 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 45 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 2 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 12 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 45 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 86 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 52 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 16 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 32 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 17) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 373 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 62 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 59 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 33 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 111 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 12) Yes
    Logging 10 Used logging in the code (found: 13) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 24 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 19 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 16 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 23 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 22 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 19 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 307 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 173 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 24 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 97 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 60 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 56 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 142 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 30 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 78 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 35 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 25 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 15 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 2 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 13 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 38 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 18 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 26 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 32 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 39 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 11 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 39 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 5 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 35 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 233 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 89 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 13 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 8 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 21 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 28 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 31 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 44 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 26 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 44 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 17 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 23 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 113 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 119 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 30 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 37 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 9 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 28 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 12 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 41 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 155 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 36 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 22 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 44 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 18 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 68 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 9 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 3 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 349 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 45 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 36 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 6 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 41 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 14 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 16) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 16 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 199 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 55 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 55 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 18 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 119 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 36 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 22 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 37 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 4 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 37 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 29 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 40 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 7 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 14 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 12 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 15 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 5 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 26 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 13 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 21 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 1 commit to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 20 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 12 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 118 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 0 issues) No
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 29 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 64 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 36 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 50 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 13 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 1 commit to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 11 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 0 issues) No
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 5 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 14 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 64 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 49 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 32 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 35 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 42 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 24 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 12 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 45 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 70 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 25 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 75 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 39 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 45 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 12) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 194 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 50 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 152 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 108 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 12) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 1247 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 71 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 26 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 21 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 79 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 32 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 64 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 12 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 23 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 39 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 32 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 29 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 33 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 20 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 80 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 81 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 50 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 79 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 60 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 24 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 175 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 19 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 79 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 36 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 70 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 24) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 142 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 45 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 52 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 21 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 25 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 50 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 44 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 84 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 63 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 98 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 49 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 20 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 53 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 51 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 24 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 13 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 276 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 98 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 41 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 24 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 70 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 42 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 33 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 6 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 23 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 7 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 4 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 16 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 20 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 27 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted No

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 42 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 3 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 52 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 55 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 50 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 41 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 58 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 45 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 39 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 28 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 62 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 76 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 15 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted No

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 18 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 45 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 171 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 55 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 32 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 80 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 14) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 84 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 33 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 3 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 36 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 71 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 14 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 43 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 201 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 73 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 37 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 37 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 107 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 58 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 43 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 20 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 25 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 95 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 20 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 126 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 143 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 29 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 26 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 18 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 61 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 25 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 23 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 10 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 27 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 240 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 24 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 16 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 34 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 25 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 89 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 98 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 12 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 48 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 19 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 57 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 21 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 26 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 40 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 83 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 49 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 9 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 4 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 44 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 28 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 42 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 21 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 25 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 16 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 30 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 49 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 32 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 28 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 27 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 94 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 41 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 83 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 448 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 40 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 27 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 55 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 18 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 18 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 19 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 136 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 65 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 63 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 19 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 29 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 64 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 50 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 129 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 15) Yes
    Logging 10 Used logging in the code (found: 12) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 415 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 73 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 30 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 21 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 72 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 37 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 70 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 25 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 11 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 20 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 96 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 24 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 16 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 22 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 19 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 29 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 165 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 56 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 9 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 31 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 26 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 44 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 100 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 38 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 149 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 18 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 15 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 124 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 24 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 16 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 16 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 62 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 29 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 13 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 11 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 25 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 3 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 38 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 16 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 73 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 65 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 19 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 3 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 16 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 83 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 9 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 39 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 41 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 37 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 25 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 161 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 39 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 14 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 9 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 36 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 22 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 35 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 56 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 181 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 55 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 52 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 72 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 376 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 66 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 19 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 49 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 28 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 38 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 84 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 126 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 107 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 92 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 11 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 23 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 9 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 35 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 20 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 217 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 103 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 29 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 20 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 46 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 9 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 79 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 95 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 50 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 37 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 54 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 32 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 36 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 26 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 1 commit to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 29 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 43 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 45 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 6 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 20 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 41 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 54 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 50 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 55 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 286 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 54 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 10 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 30 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 32 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 23 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 15 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 44 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 3 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 36 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 10 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 77 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 47 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 52 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 0 issues) No
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 6 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 40 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 25 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 33 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 53 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 33 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 107 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 7 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 56 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 103 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 63 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 35 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 56 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 50 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 11 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 111 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 15 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 15 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 158 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 15 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 22 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 28 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 34 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 79 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 82 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 31 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 74 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 126 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 10 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 45 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 76 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 16 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 68 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 11 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 8 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 10) Yes
    Logging 10 Used logging in the code (found: 17) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 187 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 65 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 15 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 23 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 15 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 3 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 8 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 14 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 3 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 28 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 45 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted No

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 46 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 84 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 53 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 39 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 255 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 34 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 8 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 29 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 5 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 23 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 14 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 34 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 57 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 38 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 49 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 18 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 12 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 28 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 43 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 21 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 44 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 37 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 74 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 66 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 23 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 17 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 13) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 29 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 18 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 29 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 83 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 38 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 11 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 45 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 19 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 28 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 53 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 22 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 41 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 43 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 31 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 13 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 25 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 218 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 53 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 8 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 14 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 14 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 35 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 17 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 97 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 64 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 28 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 20 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 36 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 51 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 34 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 44 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 17) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 22 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 12 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 269 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 13 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 8 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 34 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 44 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 13 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 29 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 31 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 68 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 33 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 64 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 75 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 19 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 7 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 290 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 50 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 11 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 33 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 28 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 37 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 10) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 77 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 40 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 67 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 12 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 59 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 10 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 25 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 134 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 28 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 32 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 76 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 35 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 43 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 13) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 15 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 331 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 13 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 36 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 21 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 18 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 12 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 275 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 30 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 17 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 25 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 34 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 26 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 86 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 92 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 242 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 84 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 17 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 38 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 47 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 58 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 42) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 16 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 60 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 76 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 25 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 15 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 55 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 19 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 77 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 16 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 121 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 46 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 12 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 19 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 9 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 34 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 10) Yes
    Logging 10 Used logging in the code (found: 38) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 282 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 70 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 16 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 36 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 39 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 51 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 48 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 73 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 7 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 4 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 22 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 36 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 64 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 51 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 54 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 9 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 18 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 50 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 21 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 60 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 39 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 22 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 16 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 60 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 56 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 90 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 5 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 2 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 34 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 37 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 62 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 22 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 84 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 45 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 4 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 1 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 31 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 19 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 69 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 9 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 21 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 9 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 26 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 128 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 63 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 9 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 18 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 44 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 49 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 62 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 58 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 16 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 25 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 526 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 20 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 12 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 25 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 8 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 24 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 203 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 43 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 17 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 5 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 41 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 46 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 30 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 122 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 67 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Did not contribute any commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 26 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 0 lines added) No
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 3 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 50 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 47 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 27 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 80 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 13 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 25 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 51 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 24 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 15 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 31 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 70 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 34 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 53 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 43 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 61 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 20 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 15 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 55 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 13 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 53 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 67 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 27 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 30 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 17 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 46 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 17 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 12 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 100 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 67 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 24 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 11 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 19 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 53 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 7 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 103 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 15 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 69 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 21 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 7 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 6 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 24 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 13) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 11 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 0 lines added) No
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 0 issues) No
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 31 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 45 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 3 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 42 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 19 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 11 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 9) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 31 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 22 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 107 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 71 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 18 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 14 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 15 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 13 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 21 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 44 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 48 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 1 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 39 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 50 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 12 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 142 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 10) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) Yes
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 27 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 45 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 35 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 15 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 30 commits to the master branch of the team repo
    • Week 12 Oct 30 2020 - Nov 05 2020: Contributed 44 commits to the master branch of the team repo
    • Week 13 Nov 06 2020 - Nov 12 2020: Contributed 50 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft 10 Updated the DG in week 10 (and contributed at least 5 lines to the DG) No
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft 11 Added some content to the UG in week 11 (found: 189 lines added) Yes
    PPP Draft 12 Added at least 5 lines to the PPP (docs/team/github_username_in_lower_case.md) in week 12 (found: 42 lines added) Yes
    v1.4 Issues 13 Has GitHub issues assigned (and closed) in milestone v1.4 (found: 2 issues) Yes
    v1.4 PRs 13 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.4 (found: 6 PRs) Yes
    PPP 13 PPP exists (docs/team/github_username_in_lower_case.md) and has been adapted Yes